kw.\*:("Costos generales")
Results 1 to 11 of 11
Selection :
The correct approach to the specification of lifting equipmentBAILES, Derrick.Paper technology (1989). 2005, Vol 46, Num 5, pp 45-47, issn 0958-6024, 3 p.Article
The benefits of food safety : An economist's viewKINSEY, J. D.Cereal foods world. 1999, Vol 44, Num 4, pp 204-205, issn 0146-6283Article
Table ronde sur le choix des méthodes d'assemblage (soudage, brasage): aspect économique, aspect qualité = Choice of joining processes (welding, brazing): economic and quality aspectsTRESSON, J; CALVET, J. N; LEROY, M et al.Annales de chimie (Paris. 1914). 1987, Vol 12, Num 6, pp 565-570, issn 0151-9107Conference Paper
Reducing and controlling overhead costsANDERSON, R. J.Drug information journal. 1996, Vol 30, Num 1, pp 89-96, issn 0092-8615Article
Project overhead costs in Saudi Arabia = Les coûts des frais généraux des projets en Arabie SaouditeASSAF, S. A; BUBSHAIT, A. A; ATIYAH, S et al.Cost engineering (Morgantown, W. Va.). 1999, Vol 41, Num 4, pp 33-38, issn 0274-9696Article
Outsourcing engineering services : The business side of the businessTRUMAN, R. B.JPT. Journal of petroleum technology. 1996, Vol 48, Num 10, pp 915-918, 3 p.Article
Reducing the overhead of the AESA metric-space nearest neighbour searching algorithmVILAR, J. M.Information processing letters. 1995, Vol 56, Num 5, pp 265-271, issn 0020-0190Article
Allgemeine Geschäftskosten: eine Untersuchung = Overheads: a study = Etude sur les frais générauxMATIJEVIC, Damir.Der Eisenbahningenieur (Hamburg). 2003, Vol 54, Num 10, pp 52-55, issn 0013-2810, 4 p.Article
Indirect cost categorization and allocation by construction contractorsHOLLAND, N. L; HOBSON, D. JR.Journal of architectural engineering. 1999, Vol 5, Num 2, pp 49-56, issn 1076-0431Article
Cache-based synchronization in shared memory multiprocessorsUMAKISHORE RAMACHANDRAN; JOONWON LEE.Journal of parallel and distributed computing (Print). 1996, Vol 32, Num 1, pp 11-27, issn 0743-7315Article
Profit-point analysis : A tool for general contractors to measure and compare costs of management time expended on different subcontractorsKIM, Yong-Woo; BALLARD, Glenn.Canadian journal of civil engineering (Print). 2005, Vol 32, Num 4, pp 712-718, issn 0315-1468, 7 p.Article